Installation; Installing Prismapro - Pfeiffer Vacuum PrismaPro QMG 250 Translation Of The Original

Compact mass spectrometer
Hide thumbs Also See for PrismaPro QMG 250:
Table of Contents

Advertisement

5 Installation
5.1 Installing PrismaPro
Danger to life due to electric voltage
High voltages are present inside the device. When touching parts that are live, there is a risk of
death. If there is visible damage, there is a risk of death when commissioning the device.
► Work on the open device must only be carried out by trained specialist personnel.
► Before carrying out any installation and maintenance work, switch the device off and disconnect
► Never open the device with the current supply connected.
► Secure the current supply against unauthorized or unintentional reactivation.
► Do not insert any objects into the vent openings.
► Never open an external power supply pack.
► Never operate an open or defective device.
► Secure a defective device against accidental operation.
► Protect the device against moisture.
Danger to life from electric shock
Inadequate or incorrect grounding of the unit leads to contact-sensitive voltage on the housing. When
making contact, increased leakage currents will cause a life-threatening electric shock.
► Before the installation, check that the connection leads are voltage-free.
► Conduct the electrical connection in accordance with locally applicable regulations.
► Make sure that the local mains voltage and frequency match rating plate specifications.
► Make sure that the mains cable and extension cable meet the requirements for double isolation
► Use only a 3-pin mains cable and extension cable with properly connected protective earthing
► Plug the mains plug into a socket with earthing contact only.
► Always connect the mains cable prior to all other cables, to ensure continuous protective earth-
Impairment from contamination and damage
Touching the devices or components with bare hands increases the desorption rate and leads to in-
correct measurements. Dirt (e.g. dust, fingerprints, etc.) and damage impair the function.
► During assembly and maintenance work on high or ultra high vacuum systems, always wear
► Only use clean tools.
► Make sure that the connection flanges are free of grease.
► Remove protective caps and protective covers from flanges and connections only when necessa-
► Remove the analyzer's transport protection only when necessary.
► Carry out all work in a well lit area.
DANGER
it from the current supply.
– After switching off, wait about 60 seconds and then disconnect all cables (power cable at the
end).
DANGER
between input voltage and output voltage, in accordance with IEC 61010 and IEC 60950.
(earthed conductor).
ing.
clean, lint-free and powder-free laboratory gloves.
ry.
NOTICE

Installation

29/86

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents