[dwbohrge-1_3.vsd, 2, en_US]
Figure 3-15
[dwbohrge-1_2.vsd, 2, en_US]
Figure 3-16
SIPROTEC 5, Operation, Manual
C53000-G5040-C003-C, Edition 08.2020
Drilling Pattern of a 1/3 Surface-Mounted Device – 1st Device Row
Drilling Pattern of a 1/2 Surface-Mounted Device – 1st Device Row
3.2 Surface-Mounted Devices with Integrated On-Site Operation Panel
Fitting the Devices
51