Rv-6Sd/6Sdl, Rv-6Sq/6Sql, Rv-12Sd/12Sdl And Rv-12Sq/12Sql - Mitsubishi Electric SD Series Installation Description

Industrial robots
Table of Contents

Advertisement

Transport robot arm
3.2.2

RV-6SD/6SDL, RV-6SQ/6SQL, RV-12SD/12SDL and RV-12SQ/12SQL

ATTENTION:
E
● Always use a crane to transport the robot arm. The transport lock must not be removed
before transport.
● The fixing screws of the transport lock and the transport bracket must be removed after
transport.
NOTE
Keep the transport lock, the transport angle and their appropriate fixing screws in a safe place for
any later transport.
ATTENTION:
E
To avoid faults, the wire rope of the crane must be attached as shown in Fig. 3-6.
Fix the transport bracket in the shoulder area of the robot. Use the supplied Allen head screws for
this. Use the two boreholes with the smallest distance to the front side of the robot arm for fixing.
NOTE
The transport brackets are already mounted at the factory. Step
robot arm is being transported for the first time.
Fix the crane hook onto the eyes of the transport bracket. You can now transport the robot.
Remove the attached transport angel after transport.
3 - 6
Installation
is therefore redundant if the

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents