Download Print this page

Gree Admiral Series Manual page 28

Advertisement

Installation Steps for Independent Scavenging Device
1. Enlarge the hole at the wall pipe hole of the original air conditioner,
size of the hole shall be . 90. Size of the wall pipe is shown as the
right picture.
2. Connect the scavenging duct to the independent scavenging
device.
3. Please refer to length of the assorted scavenging duct of the
independent scavenging device (1.5 m) and length of the
scavenging connecting wire (3 m), not only to ensure the scavenging
connecting wire and the opposite terminal in the unit room can be
inter-connected, and other end of the scavenging duct can enter the
room through the wall hole. Select the installation location at outdoor,
and then drill three holes on the external wall in accordance with the
size location in the installation dimensional drawing, put in the tagma
and fix the independent scavenging device on the wall through
sheet metal component with a screw; detailed size is shown in the
installation dimensional drawing.
· Note: Height of the independent scavenging device must
be lower than that of the indoor side wall hole, and the
scavenging duct shall be ensured to lay out as oblique type with
smooth running water, so as to avoid the possibility of
water-logging in the duct, thereby ensuring the condensed water
can smoothly flow to outdoor along the scavenging duct. See the
picture:
4. Put the scavenging connecting wire into indoor, abutting joint with
the connecting terminal matching to the indoor unit, which shall be
ensured of fixed connection. Straighten the scavenging connecting wire along the connecting duct,
and tie it to the connecting duct with bridle.
5. Put the scavenging grid through the wall pipe, and lock it in the nick at middle of the wall pipe.
Finally, cover the wall pipe at the wall hole.
6. Fix the scavenging duct on the external wall with big terminating, so as to avoid the scavenging
pipe from swaying due to external force.
right
wrong

Advertisement

loading