60/72

4.10.3 Control bus cable location

Warning!
This installation must be performed and verified by an ABB Service Technician before the initial
start-up.
Ensure that the ups installation is completely powered down.
Keep SELV cables separated from high voltage cables.
Fig.4.10.3-1 TLE Series 625 & 750
View electronic module on intermediate unit
Access to the control bus connection
The communication bus cable connectors are placed on the two boards "P13/P14 – IM0222 – Bus Interface
Board". See Fig. 4.10.3-1 and 4.10.3-2.
J1B/2÷5
J1B/1
J1A/2÷5
J1A/1
Fig. 4.10.3-3 View electronic module on intermediate unit
Q1
J1
B
J2
J1
A
J2
TLE Series 625 to 1000 PurePulse™ UL S2
Fig. 4.9.3-2 TLE Series 1000
View electronic module on intermediate unit
Control bus cables connection
Plug the cables J1A – J2A (1/2/3/4/5) and J1B – J2B
(1/2/3/4/5) on the connectors J1A – J2A and J1B – J2B
placed on the two boards "P13/P14 – IM0222 – Bus
Interface Board".
Fix the communication bus cables J1A – J2A (1/2/3/4/5)
and J1B – J2B (1/2/3/4/5) with the provided cable clamps
"A".
UPS Installation Guide / REV-B
Q1