4.5 Ventilation and cooling

Fig. 4.5-1 Installation on plain floor
The heat produced by the UPS is transferred to the environment by its ventilation.
Air inlets for UPS ventilation are located on the front of the UPS, while air outlets are on top of the cabinet.
A suitable ventilation or cooling system must be installed to extract the heat from the UPS room.
Note!
Do not put anything on the top of the cabinet.
20" (500mm) of air clearance from the top must be left free of any object for a sufficient exhausted
air exchange, proper cooling, service access and safety.
Air filtering systems could be required when the UPS operates in a dirty environment.
In order to prevent overheating of the UPS, the available air intake flow rate must exceed the total air exhaust
flow rate requirement of the UPS system.
Contact your ABB Service Center for appropriate solutions.
The below table indicates the heat dissipation at full Load at PF = 1 and charged Battery, up to 3280 ft (1000 m)
altitude, for cooling air 77°F (25°C) to 86°F (30°C).
UPS model
PF = 1
TLE Series 625
94260 BTU/hr
TLE Series 750
98325 BTU/hr
TLE Series 1000
134783 BTU/hr
Note!
Even when eBoost™ Operating Mode option is available, the ventilation and cooling system shall be
rated as for operation in VFI mode.
TLE Series 625 to 1000 PurePulse™ UL S2
Losses
VFI
PF = 1
24.7 kW
30288 BTU/hr
28.8 kW
31082 BTU/hr
39.5 kW
37951 BTU/hr
Cables
Fig. 4.5-2 Installation on raised floor
eBoost™ (option)
8.9 kW
9.1 kW
11.1 kW
UPS Installation Guide / REV-B
Cooling air flow
VFI
PF = 1
3
4240 CFM
7204 m
4944 CFM
8400 m
6780 CFM
11520 m
/h
3
/h
3
/h