ABB TLE 625 Series Installation Manual page 10

Table of Contents

Advertisement

10/72
J35µP
XA
CR
1a
Opening for top cable entry (* - for Utility input and Load output connection)
1b
Opening for top cable entry (* - for External Battery connection)
2a
Opening for bottom cable entry (* - for Utility input and Load output connection)
2b
Opening for bottom cable entry (* - for External Battery connection)
3
Bus bars for Utility input and Load output connection
4
Bus bars for External Battery connection
CI
Customer Interface Board (see Fig. 2.1-4)
CR
Connectivity Rack
J35µP
Serial port RS232 for IMV protocol
Q1
UPS Output switch
RPA
RPA board (Redundant Parallel Architecture) for Parallel System (option)
SNMP
3-ph SNMP/WEB plug-in adapter (option - see Fig. 2.1-4)
XA
Terminals for "EPO - Emergency Power Off" connection and 24Vdc for external Battery switch
*)
Remove this panel or provide means to capture metal filings from cutting conduit entry holes
RPA
Fig. 2.1-6 TLE Series 625 & 750 - General view without protection panels
TLE Series 625 to 1000 PurePulse™ UL S2
2b
UPS Installation Guide / REV-B
1b
Q1
4
2a
1a
3
Q1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tle 750 seriesTle 1000 series

Table of Contents