ABB TLE 625 Series Installation Manual page 24

Table of Contents

Advertisement

24/72
Anti-humidity & corrosion devices
B
B
A
B
B
B
B
Fig. 4.6-3 TLE Series 625 & 750
Location of the "Anti-Humidity & Corrosion devices"
B
B
B
A
B
B
B
B
Fig. 4.6-4 TLE Series 1000
Location of the "Anti-Humidity & Corrosion devices"
PROTECTIVE FOIL
to remove as indicated
in the label
PROTECTIVE
FOIL
to remove
as indicated
in the label
Fig. 4.6-5 Location of the "Protective Foil"
D
B
Q1
B
4x
3x
B
C
D
B
Q1
4x
B
B
C
PROTECTIVE FOIL
to remove as indicated
in the label
PROTECTIVE FOIL
to remove as indicated
in the label
TLE Series 625 to 1000 PurePulse™ UL S2
The package of the TLE Series 625 to 1000 includes
A
"Anti-Humidity & Corrosion devices" against the
HUMIDITY
INDICATOR
80
formation of humidity and corrosion during the
%
70
%
transportation and the storage of the UPS.
60
%
50
%
40
TLE Series 625 & 750
%
30
%
"Anti-Humidity & Corrosion devices" components:
20
%
A
Humidity indicator
B
B
Desiccant bag (15 pcs.)
C
VCI foil base
DESICCANT
B
D
PE stretch foil
A
HUMIDITY
INDICATOR
80
%
70
%
60
%
50
%
40
%
30
%
20
%
B
4x
DESICCANT
B
TLE Series 1000
"Anti-Humidity & Corrosion devices" components:
A
Humidity indicator
B
Desiccant bag (17 pcs.)
C
VCI foil base
D
PE stretch foil
Protective foil
TLE Series 625 to 1000 is provided with a "Protective Foil",
on the roof and door/front panels, to prevent material from
falling into UPS.
Warning!
It's mandatory to remove the "Protective Foil"
but only just before the first start-up of the
UPS as indicated in the appropriate label!
The removal of the "Protective Foil" should be
performed only by an ABB Service Technician!
Packing material recycling!
ABB,
protection, uses only environmentally friendly
material.
UPS packing materials must be recycled in
compliance with all applicable regulations.
UPS Installation Guide / REV-B
Warning!
It's mandatory to remove the "Anti-
Humidity & Corrosion devices" during
the unpacking of the UPS!
Humidity indicator
Before removing the devices "C - VCI foil
base" & "D - PE stretch foil", check the
status of the "A - Humidity indicator".
10% to 70%:
The UPS can be commissioned.
80%:
The UPS shall not be commissioned.
Please contact your ABB Service Centre.
in
compliance
with
environment

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tle 750 seriesTle 1000 series

Table of Contents