Operations Screen - York YK-EP Operation And Maintenance Manual

Centrifugal chiller
Hide thumbs Also See for YK-EP:
Table of Contents

Advertisement

Operations screen

Figure 58: Operations screen
This screen allows definition of general parameters having to do with the operation of the chiller.
Table 164: Display only
Field/LED name
Chilller Run Time
Table 165: Programmable
Button
Access level
Control
Operator
Source
Number of
Admin
Starts
Operating
Admin
Hours
Level Control
OptiSave
164
Description
Displays the amount of time the chiller has been running since the
last start signal was received. Value is reset to zero when the chiller
enters coastdown. It remains at zero while shutdown and during
System Prelube
Description
Defines whether the control of the chiller will be Local, Digital
Remote, Analog Remote, Modem Remote or ISN (BAS) Remote.
Displays the number of the starts the chiller has initiated. This may
be reprogrammed to a desired value (generally when this value has
been reset due to a Microboard replacement) but should not be
done so arbitrarily.
Displays the total accumulated run time of the chiller. This may be
reprogrammed to a desired value (generally when this value has
been reset due to a Microboard replacement), but should not be
done so arbitrarily
Automatically set to Analog.
Automatically set to Disabled.
YK-EP Style B Centrifugal Chiller

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

160.87-om1

Table of Contents