Replacement Of 3 Rd Level Control Module (Mbms); Battery Maintenance - Pylontech PowerCube-X1 Operation Manual

Lithium-ion phosphate energy storage system
Hide thumbs Also See for PowerCube-X1:
Table of Contents

Advertisement

Caution: Before pull out the communication cables must mark the cable number, to avoid cable
wrong sequence.
Avant de débrancher les câbles de communication, vous devez marquer leurs numéros
afin d'éviter toute séquence incorrecte.
5.2.3 Replacement of 3
5.2.3.1 Turn off the Power Switch. Refer to chapter 3.6.5.
Caution: Turn off this MBMS will stop the power output of belonging whole Battery Energy Storage
System.
La désactivation de ce MBMS arrêtera la sortie de puissance du système de stockage
d'énergie de batterie.
5.2.3.2 Dismantle the 4 screws.
5.2.3.3 Install the new MBMS inside. And reconnect the cables. Refer to chapter 3.5.
5.2.3.4 Turn on this MBMS. Refer to chapter 3.6.
Caution: Before pull out the communication cables must mark the cable number, to avoid cable
wrong sequence.
Avant de débrancher les câbles de communication, vous devez marquer leurs numéros
afin d'éviter toute séquence incorrecte.

5.3 Battery Maintenance

Danger: The maintenance of battery must done by qualified and authorized person only.
La maintenance de la batterie doit être effectuée uniquement par le personnel qualifié et
autorisé.
Danger: Some maintenance items must shut off at first.
Certains items de maintenance doivent être arrêtés en premier.
5.3.1 Voltage Inspection:
[Periodical Maintenance] Check the voltage of battery system through the monitor system. Check
the system abnormal voltage or not. For example: Single cell's voltage is abnormal high or low.
5.3.2 SOC Inspection:
[Periodical Maintenance] Check the SOC of battery system through the monitor system. Check the
level Control Module (MBMS)
rd
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powercube-x2

Table of Contents