Miele PG 8583 CD Operating Instructions Manual page 28

Washer-disinfector for laboratory glassware and laboratory utensils
Hide thumbs Also See for PG 8583 CD:
Table of Contents

Advertisement

Commissioning
Commissioning
completed
Fault 420
28
Commissioning is completed when the following message is
displayed.
Confirm the message with OK.
The washer-disinfector is now ready for use.
The settings made during the commissioning process are only
adopted after a complete programme has been run.
Select any programme, e.g.:
Press the Start/Stop button to start the programme.
After commissioning, every programme starts with reactivation of
the water softener.
If the programme is cancelled using
plumbing connections are deactivated.
Confirm the error message with OK.
Switch the machine off using the  button.
Wait approximately 10 seconds before switching the machine on
again with the  button.
The commissioning procedure starts again.
Perform commissioning and activate at least one plumbing
connection; e.g. for cold water.
Set up successful
Universal
Temperature
75 °C
Duration
1:30
Drain
.
Fault 420
h
, this means that all the

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pg 8583 cd ww adp cmPg 8583 cd ww ad cm oil

Table of Contents