Operation; Time Settings - Nordson Mesa Fulfill Customer Product Manual

Retrofit for mesa melters
Table of Contents

Advertisement

28
Fulfill
Retrofit for Mesat Melters

Operation

S
NOTE: Refer to Appendix A, Retrofit Refill System With Nordson Level Sensor, for updated
information.

Time Settings

Part 1121938_02
Once enabled, the fill system immediately begins operation. Maintain
adhesive level in the storage bin to maintain automatic operation.
NOTE: During warm‐up, the melter's ready-delay time may need to be
increased for the Fulfill to operate properly. The proper ready-delay time
depends on the tank size and shape, adhesive type, and application
temperature.
See Figure 15. There are three timers found on the PCA board in the control
box:
S
Fault - The overfill timer. A fault is generated if the Fulfill unit dispenses
longer than the time allotted. Time range is 5 to 115 seconds.
S
Delay - The time duration the Fulfill unit waits to transfer adhesive from
the storage bin to the melter once a signal from the level sensor has been
transmitted to the control box. Time range is 1 to 119 seconds.
S
Air - Used only with the optional vibrator kit. The air timer signals the
amount of time the vibrator actuates once the filling process begins.
Time range is 0 to 20 seconds.
Figure 15
PCA timer settings (located inside the control box)
Use a flat head screwdriver to turn the timers clockwise to increase the time
settings, counterclockwise to decrease the timer settings.
E 2013 Nordson Corporation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents