Baseline Setting; Final Setting - Nordson Mesa Fulfill Customer Product Manual

Retrofit for mesa melters
Table of Contents

Advertisement

S
NOTE: Refer to Appendix A, Retrofit Refill System With Nordson Level Sensor, for updated
information.
S
NOTE: Refer to Appendix A, Retrofit Refill System With Nordson Level Sensor, for updated
information.
E 2013 Nordson Corporation

Baseline Setting

Upon setting the probe's height, calibrate the level sensor.
1. Remove the threaded plug on the front face of the level sensor control
box to reveal the adjustment potentiometer.
2. Fill the tank with adhesive and allow it to melt completely.
3. Adjust the liquid level to coincide with the black line on the level probe.
4. If the LED on the control box is amber, turn the adjustment potentiometer
counter‐clockwise until it turns green. If the LED on the control box is
green, turn the adjustment potentiometer clockwise until it just turns
amber. The point at which the LED transitions from green to amber is the
switching point.
5. Once the switching point is found, rotate the adjustment potentiometer
turn clockwise and leave it at that position.

Final Setting

1. Begin normal operation. Check the adhesive level in the tank after 30
minutes of operation.
2. If the adhesive level is satisfactory, the calibration procedure is complete.
Re‐install the plug over the calibration pot to discourage tampering.
3. If unmelted adhesive is piled up to the top of the tank or the system has
already faulted due to overfilling, rotate the adjustment pot
clockwise to increase the level sensor's sensitivity. Wait 10 minutes and
check the adhesive level again. If the adhesive level is still too high,
repeat this process until the adhesive level is satisfactory. When
finished, reinstall the plug over the calibration potentiometer.
4. If unmelted adhesive has built up on the probe and the adhesive level in
the tank has dropped below the black line on the probe, rotate the
adjustment potentiometer
level sensor's sensitivity. If the adhesive level is still too low, repeat this
process until the adhesive level is satisfactory.
Fulfill
Retrofit for Mesat Melters
1
/
turn counter‐clockwise to decrease the
2
27
1
/
2
1
/
turn
2
Part 1121938_02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents