Recurrent Test Requirements
11.3.2
Testing Overview
Measuring Devices The measurement instructions provided are an example for one measuring device.
The individual steps may vary from one measuring device to another. Refer to the corresponding
manufacturer's instructions for the measuring device you are using.
NOTE: If you are unsure that your measuring device is suitable, contact Brainlab support.
Required Test
Steps
Steps
NOTE: For details on the tests to be performed, see page 147.
When performing recurrent tests:
Test Guidelines
• Perform required test steps in the order defined above.
• Measure all areas of the system indicated in the following chapters.
• All tests must be passed before the device can be considered safe.
• The calibration of the measuring device must be valid at the time of measurement.
• Perform all tests according to IEC 62353.
NOTE: The measurement outlet connection of the measuring device must remain established during
the entire measurement cycle. If you unplug the measurement outlet during measurement, the mea-
suring device recognizes that the connection is no longer established and you will need to repeat
the entire test.
• Print out or make a copy of the safety inspection form (from page 147).
Safety Inspection
Form
• Enter the inspection results.
• Compare measured values with critical values (defined on page 148) to determine if the test
• Keep form as a record of the inspection.
146
1.
Perform visual inspection.
2.
Check grounding continuity.
3.
Check functional earth function.
4.
Check equipment leakage current.
5.
Check dielectric strength.
6.
Perform functional test.
7.
Report and evaluate results.
8.
Check and prepare system for normal use.
If a test does not pass, device must be repaired by Brainlab support. After repair, re-
peat the entire electrical safety test from the beginning.
has been passed.
Technical User Guide Rev. 2.7 VectorVision & Kolibri