Installation / Removal Using Insertion Fitting 155210; Required Tools And Materials; Preparing The Insertion Fitting Before Welding To Tube - Xylem MJK SuSix Installation And User Manual

Turbidity and suspended solids transmitter
Table of Contents

Advertisement

Turbidity and Suspended Solids Transmitter

Installation / Removal using Insertion Fitting 155210

Warnings: Max. operating pressure is 6 bar (720 N).
Max. residual pressure when changing sensor is 1 bar (120 N).
The sensor guide (2) is not a safety component
The insertion fitting is not fully assembled from the factory
Be careful when dealing with corroding and toxic substances
Be careful when dealing with lines under pressure

Required Tools and Materials

• 5 mm hex key
• LOCTITE
577 sealant
®
2
7
Measure position

Preparing the Insertion Fitting before welding to tube

The nuts on the ball valve housing (see A and B arrows) have not been
tightened and secured with a sealant from the factory. This allows the
customer to rotate, position and secure the ball valve as required on the
installation site.
1. Loosen/remove the A and B nuts, and rotate the ball valve to its final
position.
EN 5.10 SuSix Manual 2007
3
1
5
Service position
21
FW: 841013-005/843003-001
4
T
6
A
B

Advertisement

Table of Contents
loading

Table of Contents