Side-By-Side Flush Mounting; Overview - ABB Relion 670 Series Installation And Commissioning Manual

Generator protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Section 5
Installing the IED
5.3.6
5.3.6.1
40
IEC06000180 V1 EN
Figure 16:
IED in the 670 series (1/2 x 19") mounted with a RHGS6 case
containing a test switch module equipped with only a test switch
and a RX2 terminal base

Side-by-side flush mounting

Overview

It is not recommended to flush mount side by side mounted cases if IP54 is
required. If your application demands side-by-side flush mounting, the side-by-side
mounting details kit and the 19" panel rack mounting kit must be used. The
mounting kit has to be ordered separately. The maximum size of the panel cut out
is 19".
With side-by-side flush mounting installation, only IP class 20 is
obtained. To reach IP class 54, it is recommended to mount the
IEDs separately. For cut out dimensions of separately mounted
IEDs, see section
When mounting the plates and the angles on the IED, be sure to use
screws that follows the recommended dimensions. Using screws
with other dimensions than the original may damage the PCBs
inside the IED.
1
2
1
2
1
2
1
1
1
1
2
2
2
2
3
3
3
3
4
4
4
4
5
5
5
5
6
6
6
6
7
7
7
7
8
8
8
8
"Flush
mounting".
Installation and commissioning manual
1MRK 502 029-UEN A
xx06000180.vsd

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion reg670

Table of Contents