1MRK 502 029-UEN A
1.1.3
1.1.4
Documents related to REG670
Operator's manual
Installation and commissioning manual
Technical reference manual
Application manual
Product guide customized
Product guide pre-configured
Rotor Earth Fault Protection with Injection Unit RXTTE4 and REG670
Connection and Installation components
Test system, COMBITEST
Accessories for 670 series IEDs
670 series SPA and signal list
IEC 61850 Data objects list for 670 series
Engineering manual 670 series
Buyer's guide REG 216
Communication set-up for Relion 670 series
Installation and commissioning manual
•
The chapter
Verifying settings by secondary injection
how to verify that each included function operates correctly according to the
set values.
•
The chapter
Commissioning and maintenance of the fault clearing system
discusses maintenance tests and other periodic maintenance measures.
•
The chapter
Fault tracing and repair
•
The chapter
Glossary
ABB technical documentation.
Intended audience
General
The installation and commissioning manual addresses the personnel responsible for
the installation, commissioning, maintenance and taking the protection in and out
of normal service.
Requirements
The installation and commissioning personnel must have a basic knowledge in
handling electronic equipment. The commissioning and maintenance personnel
must be well experienced in using protection equipment, test equipment, protection
functions and the configured functional logics in the protection.
Related documents
explains how to troubleshoot.
is a list of terms, acronyms and abbreviations used in
Section 1
Introduction
contains instructions on
Identity number
1MRK 502 028-UEN
1MRK 502 029-UEN
1MRK 502 027-UEN
1MRK 502 030-UEN
1MRK 502 031-BEN
1MRK 502 032-BEN
1MRG001910
1MRK 513 003-BEN
1MRK 512 001-BEN
1MRK 514 012-BEN
1MRK 500 092-WEN
1MRK 500 091-WEN
1MRK 511 240-UEN
1MRB520004-BEN
1MRK 505 260-UEN
13