ABB Relion 670 Series Installation And Commissioning Manual page 223

Generator protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 502 029-UEN A
Installation and commissioning manual
No operation
IEC05000551 V1 EN
Figure 104:
Test of phase difference.
3.
Change the phase angle between +dφ and -dφ and verify that the two outputs
are activated for phase differences between these values but not for phase
differences outside, see figure 104.
Testing the frequency difference
The frequency difference test should verify that operation is achieved when the
FreqDiffA and FreqDiffM frequency difference is lower than the set value for
manual and auto synchronizing check, FreqDiffA and FreqDiffM respectively and
that operation is blocked when the frequency difference is bigger.
Test with frequency difference = 0 mHz
Test with a frequency difference outside the set limits for manual and auto
synchronizing check respectively.
1.
Apply voltages U-Line equal to 100% UBaseLine and U-Bus equal to 100%
UBaseBus, with a frequency difference equal to 0 mHz and a phase difference
lower than the set value.
2.
Check that the AUTOSYOK and MANSYOK outputs are activated.
3.
Apply voltage to the U-Line equal to 100% UBaseLine with a frequency
equal to 50 Hz and voltage U-Bus equal to 100% UBaseBus, with a frequency
outside the set limit.
4.
Check that the two outputs are not activated. The test can be repeated with
different frequency values to verify that the function operates for values lower
than the set ones. If a modern test set is used, the frequency can be changed
continuously.
Testing the reference voltage
1.
Use the same basic test connection as in figure 102.
Verifying settings by secondary injection
U-Bus
+dj
U-Line operation
-dj
U-Bus
en05000551.vsd