ABB Relion 670 Series Installation And Commissioning Manual page 37

Generator protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 502 029-UEN A
A
IEC06000147 V1 EN
Figure 10:
Different mounting methods
Description
A Flush mounting
B 19" Panel rack mounting
C Wall mounting
D Side-by-side rack or flush mounting
Installation and commissioning manual
The different mounting kits contain all parts needed including screws and assembly
instructions. The following mounting kits are available:
Flush mounting kit
19" Panel (rack) mounting kit
Wall mounting kit
Side-by-side mounting kit
The same mounting kit is used for side-by-side rack mounting and side-by-side
flush mounting.
The mounting kits must be ordered separately when ordering an
IED. They are available as options on the ordering sheet in
Accessories for 670 series IED, see section
Generally, all the screws included in delivered mounting kits are of Torx type and a
screwdriver of the same type is needed (Tx10, Tx15, Tx20 and Tx25).
IEC02000684
V1 EN
If other type of screws are to be used, be sure to use the dimensions
of the screws that are given in this guide.
B
Installing the IED
"Related
C
Section 5
documents".
D
31

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion reg670

Table of Contents