Section 1
Introduction
1.1.2
12
setting parameters and technical data sorted per function. The technical reference
manual should be used as a technical reference during the engineering phase,
installation and commissioning phase, and during normal service.
The Installation and Commissioning Manual (ICM) contains instructions on
how to install and commission the protection IED. The manual can also be used as
a reference during periodic testing. The manual covers procedures for mechanical
and electrical installation, energizing and checking of external circuitry, setting and
configuration as well as verifying settings and performing directional tests. The
chapters are organized in the chronological order (indicated by chapter/section
numbers) in which the protection IED should be installed and commissioned.
The Operator's Manual (OM) contains instructions on how to operate the
protection IED during normal service once it has been commissioned. The
operator's manual can be used to find out how to handle disturbances or how to
view calculated and measured network data in order to determine the cause of a fault.
The Engineering Manual (EM) contains instructions on how to engineer the IEDs
using the different tools in PCM600. The manual provides instructions on how to
set up a PCM600 project and insert IEDs to the project structure. The manual also
recommends a sequence for engineering of protection and control functions, LHMI
functions as well as communication engineering for IEC 61850 and DNP3.

About the installation and commissioning manual

The installation and commissioning manual contains the following chapters:
The chapter
Safety information
should pay attention to.
The chapter
Overview
and commissioning an IED.
The chapter
Unpacking and checking the IED
the IED.
The chapter
Installing the IED
The chapter
Checking the external optical and electrical connections
how to check that the IED is properly connected to the protection system.
The chapter
Energizing the IED
The chapter
Set up PCM 600 communication link per IED
communication between PCM600 and the IED.
The chapter
Establishing connection and verifying the SPA/IEC-
communication
contains explains how to enter SPA/IEC settings and
verifying the communication.
The chapter
Establishing connection and verifying the LON communication
contains a reference to another document.
The chapter
Establishing connection and verifying the IEC 61850
communication
contains explains how to enter IEC 61850 settings and
verifying the communication.
The chapter
Configuring the IED and changing settings
write settings and configure the IED.
presents warning and note signs, that the user
is a summary of the major tasks faced when installing
explains how to take delivery of
explains how to install the IED.
explains how to start the IED.
1MRK 502 029-UEN A
explains
describes the
" explains how to
Installation and commissioning manual