Mounting Procedure For Flush Mounting - ABB Relion 670 Series Installation And Commissioning Manual

Generator protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 502 029-UEN A
5.3.2.2
Installation and commissioning manual

Mounting procedure for flush mounting

2
IEC08000161 V1 EN
Figure 11:
Flush mounting details.
PosNo Description
1
Sealing strip, used to obtain IP54 class. The sealing strip is factory
mounted between the case and front plate.
2
Fastener
3
Groove
4
Screw, self tapping
5
Joining point of sealing strip
6
Panel
Procedure
1.
Cut an opening in the panel (6).
Installing the IED
6
3
4
Section 5
1
5
xx08000161.vsd
Quantity Type
-
-
4
-
-
-
4
2.9x9.5 mm
-
-
-
-
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion reg670

Table of Contents