Section 3 Overview; Commissioning And Installation Overview - ABB Relion 670 Series Installation And Commissioning Manual

Generator protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 502 029-UEN A
Section 3
3.1
Installation and commissioning manual
Overview
About this chapter
This chapter outlines the installation and commissioning of the IED.

Commissioning and installation overview

The settings for each function must be calculated before the commissioning task
can start. A configuration, done in the configuration and programming tool, must
also be available if the IED does not have a factory configuration downloaded.
The IED is unpacked and visually checked. It is preferably mounted in a cubicle or
on a wall. The connection to the protection system has to be checked in order to
verify that the installation is successful.
Section 3
Overview
19

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion reg670

Table of Contents