ABB Relion 670 Series Installation And Commissioning Manual page 85

Generator protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 502 029-UEN A
Installation and commissioning manual
Cc
1
2
3
4
5
6
X1
IED
PE
IEC07000141 V1 EN
Figure 52:
Communication cable installation, 2-wire
Where:
1
The inner shields shall be connected together (with an isolated terminal block) and only
have one earthing point in the whole system, preferably at the external equipment (PC).
The outer shield shall be connected to Protective Earth (PE) in every cable end that is, to PE
at all IED terminals and to PE at External equipment (PC). The first IED will have only one
cable end but all others of course two.
2
Connect according to installation instructions for the actual equipment, observe the 120
ohms termination.
3
The protective earth should be close to the external equipment (< 2m)
Cc
Communication cable
PE
Protective earth screw
Cc
1)
1
2
3
4
5
6
X1
IED
PE
PE
Section 5
Installing the IED
2)
External
Equipment (PC)
PE 1) 3)
en07000141.vsd
79