GARO Twinbox GTB Series Assembly Instructions / End User Instruction page 13

Table of Contents

Advertisement

The first GTB Twinbox in the grid will be the "Master" in the
installation and it is set by SW1 Dip 5 on CC2. All other units in
the grid should be "slaves" set by SW1 Dip 5 on CC2.
First and last GTB Twinbox in the grid should be "end-terminated"
and this is set by SW1 Dip 6 on CC2.
SW1 CC2
ON
OFF
SLAVE
End term
(picture 14)
SW1
CC2
ON
OFF
MASTER
5
(table 3)
INSTALLATION OF STANDALONE GTB TWINBOX
Schematic image with Twinbox placed in the center of the cluster
SW1 CC2
ON
OFF
6
6
5
5
SLAVE
Settings explanation of Dip 5, 6 on SW1 CC2
SW1
CC2
ON
OFF
SLAVE
5
EN
SW1 CC2
ON
OFF
6
5
MASTER
SW1
End term
ON
OFF
6
13
SW1 CC2
ON
OFF
6
5
SLAVE
End term
CC2
SW1
CC2
OFF
End term
ON
OFF
ON
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents