Dynamic Load Management (Dlm) For Gtb Twinbox In A Grid - GARO Twinbox GTB Series Assembly Instructions / End User Instruction

Table of Contents

Advertisement

Dynamic Load Management (DLM) for GTB Twinbox
in a grid
To activate DLM for GTB Twinboxes installed in a grid, a Modbus
energy meter must be installed in the supply distribution box. It
is also possible to install a 2nd Modbus energy meter when you
need to measure the consumed energy at more than one place.
The following energy meters are approved:
• Garo GNM1D-RS485
• Garo GNM3D-RS485 (current transformer 3-phase. Max
current is based on current transformer)
• Garo GM3T-RS485
• Garo GNM3T-RS485
• CG EM 112
• CG EM 270
• CG EM 271
SW1 CC2
ON
OFF
MASTER
End term
(picture 13)
INSTALLATION OF STANDALONE GTB TWINBOX
Schematic image with Twinbox placed to the left of the cluster
SW1 CC2
ON
OFF
6
6
5
5
SLAVE
EN
For use in systems that have local electricity production (solar cell,
wind etc)
Garo GNM3D-LP-RS485 (current transformer 3-phase. Max
current is based on current transformer)
Garo GNM3T-LP-RS485
Note the energy meter's Modbus address must be set to #100
(and #101 for a 2nd e-meter).
The energy meter/meters continually measures the total energy
consumption for each phase. Data is transmitted to the first
wallbox (GTB Master), which controls the charging current per
phase for the entire system in order to prevent the main fuses from
tripping.
The Master GTB in the grid needs to have a wifi module installed.
A maximum of 16 GTB Twinbox may be connected together in a
grid by a shielded twisted pair cable. See picture 13, 14.
It is allowed to mix GTB Twinbox with GLB Wallbox in this type of
grid, and the limit is max 32pcs "outlets",
(GTB = 2pcs outlets and GLB = 1pcs outlet).
SW1 CC2
ON
OFF
6
5
SLAVE
12
SW1 CC2
ON
OFF
6
5
SLAVE
End term

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents