ABB Gas Sampling Probe 2 Operator's Manual page 18

Table of Contents

Advertisement

18
The following figure shows the power cable led through the wall tube with the
Harting connector mounted on the mounting plate:
1
Mounting plate for Harting connector
2
Harting connector, degree of protection IP55
Step
Action
1
Connect the cables of the current lead to the Harting connector as
shown in the above connector pin assignment .
2
Connect the Harting connector to the power supply.
260
1