FusionModule1000B Air-Cooled IT Solution
Maintenance Guide
6.1 Replacing Power Supply and Distribution System
Components
6.1.1 Replacing a PD510
Prerequisites
Impact on the System
Certain services in the FusionModule1000 are interrupted.
Preparations
Tools: Phillips screwdriver, protective gloves
Materials: spare PD510 electricity meter
Documents: documents delivered with the PD510 electricity meter, management system
initial configuration table
Skill requirement: power distribution system engineer
Procedure
Step 1 Disconnect the upstream fuse of the PD510 electricity meter.
Issue 02 (2017-01-10)
A PD510 electricity meter needs to be replaced.
A spare PD510 electricity meter of the same model is available and functional.
For the table, see the initial configuration parameter manual for the solution in use.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6
Parts Replacement
6 Parts Replacement
77