Installation Checklist For Simplex Technical Representative - Simplex 4100 Installation Manual

Emergency warning and intercommunication system (ewis)
Table of Contents

Advertisement

SIMPLEX 4100 EWIS
INSTALLATION MANUAL

2.8 INSTALLATION CHECKLIST FOR SIMPLEX TECHNICAL REPRESENTATIVE

Step
Procedure
1.
Use the Packing List in the "Layout" pages to verify
delivery/availability of all required system hardware. This
includes the printed circuit boards.
2.
Unlock, then open the panel door. Remove the retainer by
removing the top and bottom screws, then squeeze and
pull the two black plastic tabs located on the upper part of
the retainer. Lift the retainer from the back box.
3.
Visually inspect the 4100 system. Verify that all wiring is
connected to the panel, to include the unified ground.
4.
Use a volt/ohmmeter to check system wiring.
includes all wiring to the panel, local and remote
annunciators, etc. Check the AC power input to the power
supply. Repair required circuits prior to powering up the
system.
5.
Check jumpers, switches, capacitors and resistors on all
system printed circuit boards. Match the address label on
the motherboard to the address label on the daughter
board, then install each daughter board.
6.
Install all wiring harnesses and cables (except battery).
This includes auxiliary relay and signal cables.
7.
Apply power to the system.
• If the system is trouble-free, perform "System Test
• If the system displays abnormal conditions, perform
Document No.: 4100-M011
Procedures".
troubleshooting procedures.
March 1998
Page 19
Page
1
3
3
This
3
3
9
60
68
70
Issue 1.0

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents