Circulation Through Gun Manifold - Graco Reactor 2 Hydraulic Operation

Proportioning systems
Table of Contents

Advertisement

Fluid Circulation
Circulation
Circulation Through
Circulation
Through Gun
Through
NOTICE
NOTICE
NOTICE
To prevent equipment damage, do not circulate
luid containing a blowing agent without consulting
with your material supplier regarding luid
temperature limits.
NOTE: Optimum heat transfer is achieved at lower
NOTE:
NOTE:
luid low rates with temperature set points at desired
drum temperature. Low temperature rise deviation
errors may result.
Circulating luid through the gun manifold allows
rapid preheating of the hose.
1. Install gun luid manifold (P) on accessory
circulation kit (CK). Connect high pressure
circulation lines (R) to circulation manifold.
P
The Fusion AP gun manifold is shown.
CK
Gun
CK
CK
Gun
Gun
246362
Fusion AP
256566
Fusion CS
48
Gun Manifold
Gun
Manifold
Manifold
CK
R
Manual
Manual
Manual
309818
313058
2. Route circulation lines back to respective
component A or B supply drum. Use hoses
rated for the maximum working pressure of this
Technical Speciications
equipment. See Technical
Technical
3. Follow procedures from
4. Turn main power switch on.
5. Set temperature targets. See
6. Before starting the motor, unlock the hydraulic
compensator knob, then rotate counter-clockwise
until it ceases to move.
7. Press motor
to start motor and pumps.
Circulate luid at lowest possible pressure until
temperatures reach targets.
8. Press
to turn on the hose heat zone.
9. Turn on the A and B heat zones. Wait until the
luid inlet valve temperature gauges (FTG) reach
the minimum chemical temperature from the
supply drums.
10. Turn off motor.
Speciications.
Speciications
Startup, page
44.
Targets, page
39.
334945C