Startup - Graco Reactor 2 Hydraulic Operation

Proportioning systems
Table of Contents

Advertisement

Startup

Startup
Startup
Startup
To prevent serious injury, only operate Reactor with
all covers and shrouds in place.
NOTICE
NOTICE
NOTICE
Proper system setup, startup, and shutdown
procedures are critical to electrical equipment
reliability. The following procedures ensure steady
voltage. Failure to follow these procedures will
cause voltage luctuations that can damage
electrical equipment and void the warranty.
Check luid
luid inlet
inlet ilter
ilter screens.
1. Check
Check
luid
inlet
ilter
Before daily startup, ensure that the
luid inlet screens are clean. See
Fluid Inlet Strainer Screens, page
2. Check
Check ISO
Check
ISO lubrication
ISO
lubrication reservoir.
lubrication
Check level and condition of ISO lube daily. See
Pump Lubrication System, page
3. Use A and B Drum Level Sticks (24M174) to
measure the material level in each drum. If
needed, the level can be entered and tracked in
the ADM. See
Advanced Setup Screens, page
4. Check
Check generator
Check
generator fuel
generator
fuel level.
fuel
NOTICE
NOTICE
NOTICE
Running out of fuel will cause voltage
luctuations that can damage electrical
equipment and void the warranty. Do not run
out of fuel.
44
screens.
screens.
57.
reservoir.
reservoir.
59.
level.
level.
Conirm main
main power
5. Conirm
Conirm
main
generator.
generator.
generator.
6. Ensure the main breaker on the generator is in
the off position.
7. Start the generator. Allow it to reach full operating
temperature.
8. Turn
Turn main
Turn
main power
main
power switch
power
The ADM will display the following screen until
communication and initialization is complete.
35.
power switch
switch is is is OFF
OFF before
before starting
power
switch
OFF
before
switch ON.
switch
ON.
ON.
starting
starting
334945C

Advertisement

Table of Contents
loading

Table of Contents