Typical Installation, With Gun Luid Manifold To; Drum Circulation - Graco Reactor 2 Hydraulic Operation

Proportioning systems
Table of Contents

Advertisement

Typical Installation, with gun luid manifold to drum circulation
Typical Installation,
Installation, with
Typical
Typical
Installation,
circulation
circulation
circulation
R
M
K
G
(A-ISO)
D
S
Figure 3
* Shown exposed for clarity. Wrap with tape during operation.
A
Reactor Proportioner
B
Heated Hose
C
Fluid Temperature Sensor (FTS)
CK
Circulation Block (accessory)
D
Heated Whip Hose
F
Gun Air Supply Hose
G
Feed Pump Air Supply Lines
H
Agitator Air Supply Line
18
with gun
gun luid
with
gun
M
K
H
G
(B-RES)
J
E
P
C*
luid manifold
manifold to to to drum
luid
manifold
R
L
J
J
Fluid Supply Lines
K
Feed Pumps
L
Agitator
M
Desiccant Dryer
N
Bleed Lines
P
Gun Fluid Manifold (part of gun)
R
Recirculation Lines
S
Remote Display Module (optional)
drum
drum
A
F
N
N
B
334945C

Advertisement

Table of Contents
loading

Table of Contents