– You can copy the master copy to the project and overwrite duplicate blocks without
The other possibility mentioned in the dialog, "Rename and add objects", does not resolve
the conflict in this case.
SINUMERIK STEP 7 Toolbox V15.1
Configuration Manual, 12/2018, A5E46279635B AA
knowing which blocks have caused the conflict. In this case, select in the dialog box
"Replace existing objects and move to this location" and confirm with "OK".
Programming the PLC
4.4 Conflicts when copying blocks
75