COMPLETING THE INSTALLATION

Setting the Cable Pass-Through (Figure 1-18 - Figure 1-20)

The each cabinet has two cable pass-throughs - one each on the left and right sides of the cabinet. The block
plate should be in place for any unused pass-through in order to help keep dust out of the cabinet.
1.
1-20 ◆ Section 1: Installing the Cabinet
There are two opening options - one setting provides a small pass-through, the other provides a
larger pass-through. Determine which type is required for the cabinet.
Block Plate
Figure 1-18: CABLE PASS-THROUGH
Cabinet
Aspire S Hardware Manual