Air Lines; Accessoryair Chuck (If Equipped) - International H-400C Operator's Manual

Pay loader
Table of Contents

Advertisement

SECTION 8
MAINTENANCE
Page 10
AIR PRESSURE SYSTEM
lIIust. 12
Moisture Ejector Valve Drain Pin.
Moisture may also accumulate in the bottom of the moisture
ejector valve. Press the pin (illust.
12) in the bottom
of the
valve up to drain any moisture accumulation.
AIR LINES
Inspect all hoses and connections
to be sure they are not
leaking.
1. Coat all air system hose connections
with
soapsuds to
check for leakage.
2. Apply the brakes while checking the hose connections from
the brake valve to the brake actuators.
3.
Continue applying the brakes until the check has been
completed.
NO LEAKAGE IS PERMISSIBLE.
ACCESSORY AIR CHUCK
(If equipped)
The accessoryair chuck (1, Illust. 13) receivesits air supply
from the machine air pressure system. Before using the air
chuck, drain all moisture from the system. Refer to "Draining
the Air Tanks." Install the safety bar in the straight lock
position. Start the engineand build up the air system pressure.
Attach an air valve to the end of the hose,which is supplied
with the attachment. Insert the other end of the hoseinto the
air supply chuck on the machine. Disconnect the hose from
the chuck when not in use.
lIIust. 13
AccessoryAir Chuck

Advertisement

Table of Contents
loading

Related Products for International H-400C

Table of Contents