International H-400C Operator's Manual page 59

Pay loader
Table of Contents

Advertisement

SECTION 7
SCHEDULED
MAINTENANCE
Page 14
u
SERVICE POINTS
Item 21 . Power Cluster Reservoir Fluid Level
(Illust. 10)
lIIust. 10
Power Cluster Fluid Reservoir(Front).
1. Sight Gauge.
2. Cap.
3. Boot.
4. Fluid Level Line.
5. Clamp.
There are two power cluster brake fluid reservoirs. One is
located in the front frame to the left side of the main
hydraulic valve. The other is located in the rear frame on the
right side above the power cluster. Check the sight gauge(1)
on eachfluid reservoir.The sight gaugeshould be completely
filled with fluid. If the gaugeis only partially filled or shows
no fluid at all, pull the wire clamp (5) off of the cap (2),
remove the cap and rubber boot (3) inside and fill the
reservoir with brake fluid to the fluid level line (4). Refer to
"LUBRICANT SPECIFICATIONS AND CAPACITIES" in
this section for the type of brake fluid specified. Install the
rubber boot and cap and securewith the wire clamp.
Item 22 . Fan Hub
Remove the allen head plug from the fan hub and install a
greasefitting. Apply the lubricator until clean greaseappears.
Removethe greasefitting and reinstall the allen head plug.
u
SCHEDULED MAINTENANCE PAYS
KEEP IT CLEAN

Advertisement

Table of Contents
loading

Related Products for International H-400C

Table of Contents