1. HANDLING THE PACKAGED MACHINE

The machine is contained in specific packaging with a pallet for the handling with fork trucks. The
packages cannot be placed on top of each other.
The total mass of the machine with packaging is 240 kg (without batteries)
The dimensions of the packaging is as follows:
65-75-85-100 B
A: 1610mm
B: 730mm
C: 1600mm

2. HOW TO UNPACK THE MACHINE

1. Remove the outer packaging
2. The machine is fixed to the pallet with wedges which block the wheels
3. Remove the wedges
4. Use a chute to get the machine down from the pallet, pushing it backwards. Do not assemble the rear
squeegee before unloading the machine, and avoid violently jolting the brush head. To assemble the
squeegee, read the "ASSEMBLING THE SQUEEGEE" paragraph.
5. Keep the pallet for any future transport needs
WARNING: if the product is delivered in cardboard containers, handle the
packed product with suitable lifting means that comply with the legal
requirements

3. HOW TO MOVE THE MACHINE

1.
Make sure the recovery tank and the solution tank are empty
2.
Check that the base and squeegee are lifted off the ground
3.
Place it on a pallet using a chute
4.
Check that the key switch is on OFF and remove the key
5.
Engage the parking brake
6.
Secure the machine to the pallet using wooden wedges

4. INSTRUMENT PANEL COMPONENTS

The instrument panel components are identified as follows:
1.
Battery level / hour-counter display
2.
Battery level hour meter display control button
3.
Main key switch
4.
Red warning light indicating that the parking brake is on

MACHINE PREPARATION

10
A
C
1
2
4
3
B

Hide quick links: