Wall Penetration In Dry/Lightweight Construction Wall - OBO Bettermann PYROLINE Rapid Mounting Instructions

Fire protection duct
Table of Contents

Advertisement

Mounting instructions PYROLINE
6 2 2

Wall penetration in dry/lightweight construction wall

The mounting process described below allows achievement of a fire re-
sistance class I90, depending on the fire resistance length of the wall. For
I 120, see "6.3.8 Mounting a wall/ceiling penetration" on page 62.
Note!
T he distance from the wall to the next suspension points must not exceed
350 mm.
7
6
5
Fig 51: Wall penetration through dry/lightweight construction wall
1 Ceiling
3 Mineral wool insulation, mater-
ial class A 1, melting point
> 1,000 °C, e.g. OBO MIW
5 Mineral fibre plate as support
profile
7 For BSKM 1025: insert lid
support BSKM-DS 1025
Lay the ends of the duct on a mineral fibre plate 5 .
When plugging the mineral wool 3 , it is advisable to use an im-
plement such as a stick and push as much as possible into the gap
above the ducts, in order to achieve as high a density as possible.
Moisten the surface of the mineral wool and the mineral fibre plate
slightly with water and coat both sides with filler 6 with a thickness of
min. 2 mm.
Rapid fire protection duct
®
Mounting on a support system
BSKM 0407/0711/
1025
I30
I60
I90
5-10 mm
BSKM 0407/ 0711/
1025
≤ 350 mm
2 Dry construction wall with
heat insulation
4 Gap between ducts: 5‒10 mm
6 Sealing with filler
1
2
3
4
EN | 47

Advertisement

Table of Contents
loading

Table of Contents