Mounting On A Support/Bracket - OBO Bettermann PYROLINE Rapid Mounting Instructions

Fire protection duct
Table of Contents

Advertisement

Mounting instructions PYROLINE
6 1 3

Mounting on a support/bracket

With this mounting type, the duct route is supported by brackets (recom-
mended: AW 15..), which, in turn, are fastened to ceiling supports (rec-
ommended: US5 K..). We recommend using the OBO bolt tie, type BZ
12-15-35/110, for ceiling fastening of the support.
We recommend a maximum distance of 100 mm between the support
element and the joint.
Fasten the duct to the bracket with a combination of M6 bolt, nut and
washer.
After filling with cables, seal the joint between the two ducts with a
combination of a support plate (BSKM-AD 0407, BSKM-AD 0711 or
BSKM-AD 1025) and duct connector (BSKM-VD 0407, BSKM-VD 1025 or
BSKM-VD 0711).
Screw the support plate to both ducts using the four self-tapping
screws contained in the scope of delivery of the support profile.
Then screw the duct connector to the support profile.
m a x .
Fig 47: Example for routing on support/bracket
With support/bracket mounting, we recommend using the system compo-
nents shown in Fig. 48.
AW 15 .. FT
SKS 10X80 F
Fig 48: Example of support/bracket mounting
To fasten the support to the ceiling, we recommend using two OBO bolt
ties, type BZ 12-15-35/110.
Rapid fire protection duct
®
Mounting on a support system
1 0 0 m
m
m a x .
1 m
US 5 K .. FT
DSK 45 FT
EN | 43

Advertisement

Table of Contents
loading

Table of Contents