Wall Penetration In Dry/Lightweight Construction Wall - OBO Bettermann PYROLINE Rapid Mounting Instructions

Fire protection duct
Table of Contents

Advertisement

Direct mounting on the ceiling, wall or floor
30 | EN
When plugging the mineral wool 2 , it is advisable to use an imple-
ment such as a stick and push as much as possible into the gap, in
order to achieve as high a density as possible.
Moisten the surface of the mineral wool slightly with water and coat
both sides with filler 4 with a thickness of min. 2 mm.
5 5 2

Wall penetration in dry/lightweight construction wall

The mounting process described below allows achievement of a fire re-
sistance class I90, depending on the fire resistance length of the wall. For
I 120, see "5.6.6 Mounting a reducer" on page 36.
6
5
4
Fig 29: Wall penetration through dry/lightweight construction wall
1 Ceiling
3 Doubly covered, insulated
lightweight construction wall
(the opening soffit can be just
one layer)
5 For BSKM 1025: insert lid
supports BSKM-DS 1025
When plugging the mineral wool 2 , it is advisable to use an imple-
ment such as a stick and push as much as possible into the gap, in
order to achieve as high a density as possible.
Moisten the surface of the mineral wool slightly with water and coat it
with filler 4 with a thickness of min. 2 mm.
BSKM 0407/0711/
1025
I30
I60
I90
5-10 mm
BSKM 0407/0711/
1025/
2 Mineral wool insulation, mater-
ial class A 1, melting point
> 1,000 °C, e.g. OBO MIW
4 Sealing with filler
6 Gap between ducts: 5‒10 mm
OBO Bettermann
1
2
3

Advertisement

Table of Contents
loading

Table of Contents