Fastening The Air-Termination Rod To Pipes, A Wall Or T Support - OBO Bettermann isCon PR 90 SW Mounting Instructions

Lightning protection system
Hide thumbs Also See for isCon PR 90 SW:
Table of Contents

Advertisement

Installing the isCon® system
7 6
Note!
46 | DE
Fastening the air-termination rod to pipes, a wall or T
support
The isCon
system can offer supports for fastening to pipes, walls or T
®
supports for mounting isFang air-termination rods with air-termination rod
stands (see "5.5.2 Air-termination rod support for isFang mounting" on
page 18). This applies to air-termination rods with openings at the side
or the bottom, as well as to rods with an external isCon
Fig 48: Fastening air-termination rods to pipes, walls or T supports
Please note:
– Fasten the air-termination rod to the building structure using the sup-
ports listed in Tab. 5 on page 19 and suitable fastening materials.
– In the case of a non-metallic building structure, connect the equi-
potential bonding directly to the equipotential bonding of the
air-termination rod (see "7.8 Attaching the potential connection" on
page 48).
I n the case of a metallic, earthed building structure, the equipotential
bonding is created using the metallic fastening clips of the air-termination
rod. No additional connection is required.
conductor.
®
OBO Bettermann

Advertisement

Table of Contents
loading

Table of Contents