Mounting On A Profile Rail - OBO Bettermann PYROLINE Rapid Mounting Instructions

Fire protection duct
Table of Contents

Advertisement

Mounting on a support system
42 | EN
6 1 2

Mounting on a profile rail

With this type of mounting, profile rails fastened to threaded rods serve as
support elements for the duct route (e.g. type MS21..).
We recommend a maximum distance of 100 mm between the support
element and the joint.
Screw the ducts to the profile rails with self-tapping screws of type
BSKM-S 4008 (available as an accessory).
Alternatively, you can drill through the ducts at their support point and fas-
ten them to the profile rail with a combination of M6 bolt, nut and washer.
After filling with cables, seal the joint between the two ducts with a
combination of a support plate (BSKM-AD 0407, BSKM-AD 0711 or
BSKM-AD 1025) and duct connector (BSKM-VD 0407, BSKM-VD 0711 or
BSKM-VD 1025).
Screw the support plate to both ducts using the four self-tapping
screws contained in the scope of delivery of the support profile.
Then screw the duct connector to the support profile.
Fig 46: Routing with profile rail, here, e.g. MS 21..
m a x .
1 0 0 m
m
m a x .
1 m
MS 21..
OBO Bettermann

Advertisement

Table of Contents
loading

Table of Contents