PHASE 6 | Final Adjustments
H o r
i z o n
t a l
a l i g
n m
Step 1
Check the vertical and horizontal alignment of the
beams and screens.
ILINE INSTALLATION GUIDE | 45
1
e n t
* Adjust height of each coupling-nuts
to level the base plate of each post.
Step 2
If not aligned, use a 1/2" spanner to rotate the
coupling nuts on the base to change each corner's
elevation until leveled.
NOTE:
Use a leveling guide for accuracy.
Completed ILINE
ILINE 90°/180° (4-WAY)
2
.
amqsolutions.com