PHASE 5 | Installing Screens
NOTE:
Pre-measuring each clip's
distance from the beam
ends before attaching will
ensure a centered and
balanced appearance
to the installed screen.
(Suggested distance
between clip and beam
edge: 11 inches.)
NOTE:
For 22" or 28" high
screens, metal strip along
the length of the screen
should be located on the
bottom when installed.
NOTE:
Frosted glass screens
cannot be used with ILINE.
Step 1
Place 2 screen clips on top of each beam and
loosely link both sides with a screw and nut.
Step 2
Insert plastic sleeves into the opening of each
screen clip.
Step 3
Insert the screen into the screen clip. Make sure
the metal side is down and fabric side is up.
ILINE INSTALLATION GUIDE | 44
1
4
Step 4
Tightly screw the screen clips with #6 allen wrench
to secure the screens in place.
Step 5
Repeat Steps 1-4 for each screen.
ILINE 90°/180° (4-WAY)
3
2
#6 Allen Wrench
(Angle-tip is recommended)
amqsolutions.com