COMPONENTS ILINE 180° (2-WAY) 180° Post is for inline/2-way applications only 2-Way Post Top Cap Base Plate Post Side Cover Vertical Post Nuts Feet Assembly Beam Horizontal Beam Face Plate Cover Sliding Clip Receptacle Data Face Plate Data Adaptor Cover Junction Bracket Junction Bracket Bottom Beam Plate...
PHASE 2 | Beam Assembly (3-Circuit) ILINE 180° (2-WAY) Step 1 Step 2 Place beam upside down on the floor to reveal the Insert the sliding clip into the beam from the top beam canal. and slide it to the sides. (Make sure the tab below the clip goes into the slot on the beam.) amqsolutions.com ILINE INSTALLATION GUIDE | 6...
Page 7
PHASE 2 | Beam Assembly (3-Circuit) ILINE 180° (2-WAY) Step 3 Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the receptacles facing the beam cut-out. Beam Cut-Out Side Step 4 Step 5...
PHASE 2 | Beam Assembly (4-Circuit) ILINE 180° (2-WAY) Step 1 Step 2 Place beam upside down on the floor to reveal the Insert the sliding clip into the beam from the top beam canal. and slide it to the sides. (Make sure the tab below the clip goes into the slot on the beam.) amqsolutions.com ILINE INSTALLATION GUIDE | 8...
Page 9
PHASE 2 | Beam Assembly (4-Circuit) ILINE 180° (2-WAY) Step 3 Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the receptacles facing the beam cut-out. Beam Cut-Out Side Step 4 Step 5...
PHASE 1 | Post, Beam Plate & Feet Assembly (cont .) ILINE 180° (2-WAY) NOTE: Inner-to-Inner beams are slightly longer than Outer-to-Inner beams. NOTE: L-shaped configurations must use Inner-to-Inner beam. Step 1 Step 3 Once complete, lay each beam assembly between Slide the beam assemblies onto each of the each foot assembly.
Page 11
PHASE 1 | Post, Beam Plate & Feet Assembly (cont .) ILINE 180° (2-WAY) Step 4 Take the exposed end of the power entry and feed through the desired end of the beam and into the adjacent post-opening. Continue to feed the power entry until the exposed end is out through one of the base plate’s openings.
Page 12
PHASE 2 | Post, Beam Plate & Feet Assembly (cont .) ILINE 180° (2-WAY) Step 1 Step 3 Connect power entry plug to the junction block. Connect the jumper to each junction block. Step 2 Step 4 Feed the jumper through the beam canal and Repeat Steps 1-3 until the last jumper is connected into the vertical post opening into the next beam the last junction block.
Page 13
PHASE 3 | Post, Beam Plate & Feet Assembly (cont .) ILINE 180° (2-WAY) Step 1 Step 2 Insert side covers into all exposed openings of Place top caps on all vertical posts. each vertical posts. Step 3 Step 4 Take two data adapters/face plates and snap Insert the bottom beam plates between each data them onto each end of the underside of the beam...
Page 14
PHASE 4 | Post, Beam Plate & Feet Assembly (cont .) ILINE 180° (2-WAY) Step 1 Check the horizontal alignment of the beams Step 2 If not aligned, please rotate the foot to adjust each post’s elevation until leveled. NOTE: Use a leveling guide for accuracy.
COMPONENTS ILINE 120° (3-WAY) 3-Way Post Top Cap Post Side Cover Hex Nuts Vertical Post Base Plate Glide,OEM 4-Way Post Top Cap Post Side Cover Hex Nuts Base Place Kit Post Sleeve Vertical Post Foot SRE Foot SRC Foot DRE Foot DRC amqsolutions.com ILINE INSTALLATION GUIDE | 16...
Page 17
COMPONENTS ILINE 120° (3-WAY) Beam Horizontal Beam Face Plate Cover Sliding Clip Receptacle Cover Data Face Plate Data Adaptor Junction Bracket Junction Bracket (3 circuit) (4 circuit) Bottom Beam Plate amqsolutions.com ILINE INSTALLATION GUIDE | 17...
PHASE 2 | Beam Assembly (3-Circuit) ILINE 120° (3-WAY) Step 1 Step 2 Place beam upside down on the floor to reveal the Insert the sliding clip into the beam from the top beam canal. and slide it to the sides. (Make sure the tab below the clip goes into the slot on the beam.) amqsolutions.com ILINE INSTALLATION GUIDE | 19...
Page 20
PHASE 2 | Beam Assembly (3-Circuit) ILINE 120° (3-WAY) Step 3 Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the receptacles facing the beam cut-out. Beam Cut-Out Side Step 4 Step 5...
PHASE 2 | Beam Assembly (4-Circuit) ILINE 120° (3-WAY) Step 1 Step 2 Place beam upside down on the floor to reveal the Insert the sliding clip into the beam from the top beam canal. and slide it to the sides. (Make sure the tab below the clip goes into the slot on the beam.) amqsolutions.com ILINE INSTALLATION GUIDE | 21...
Page 22
PHASE 2 | Beam Assembly (4-Circuit) ILINE 120° (3-WAY) Step 3 Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the receptacles facing the beam cut-out. Beam Cut-Out Side Step 4 Step 5...
PHASE 1 | Footer & Base Plate Assembly ILINE 120° (3-WAY) Step 1 Insert a 3” bolt into each of the 2” compression springs. Step 2 Insert the bolts and the - 4” x 3” Bolt (5/16” x 18) compression springs into the inner corner holes of the base plate.
Page 24
PHASE 2 | Footer & Base Plate Assembly ILINE 120° (3-WAY) amqsolutions.com ILINE INSTALLATION GUIDE | 24...
PHASE 3 | Post & Beam Assembly ILINE 120° (3-WAY) Step 1 Step 2 Assemble the base plate, glide and post together. Slide the beam assembly into the open slots in the center of vertical post. Fasten the beams using two screws on each end.
PHASE 4 | Entering Electric Base Feed ILINE 120° (3-WAY) 7/16” Spanner Use 1/4”-20 hex nut to tight down posts on the footer-assemblies Step 1 Step 2 Take the exposed end of the power entry and feed Plug the power entry plug to the junction block. through the center vertical post.
PHASE 5 | Cover and Trim Assembly ILINE 120° (3-WAY) & Step 1 Step 3 Insert side covers into each exposed opening in Snap on data face plates onto each end of the vertical posts. beam assemblies. Step 2 Step 4 Attach top cover to the center vertical post.
PHASE 6 | Installing Caps & Covers — Post Sleeve ILINE 120° (3-WAY) Step 1 Detach the pre-cut portion for the base feed access and line up with post. Step 2 Align the Post Sleeve* on both sides and apply pressure until pieces snap into place. Step 3 Installed Post Sleeve.
PHASE 7 | Extending the Configuration ILINE 120° (3-WAY) Step 1 Step 3 Selecting the post that will accommodate the Feed the jumper through the beam canal and extension, replace the end foot plate (DRE) with a into the vertical post opening into the next beam center foot.
COMPONENTS ILINE 90°/180° (4-WAY) 4-Way Post Top Cap Post Side Cover Hex Nuts Base Place Kit Post Sleeve Vertical Post Foot SRE Foot SRC Foot DRE Foot DRC amqsolutions.com ILINE INSTALLATION GUIDE | 31...
Page 32
COMPONENTS ILINE 90°/180° (4-WAY) Beam Horizontal Beam Face Plate Cover Sliding Clip Receptacle Cover Data Face Plate Data Adaptor Junction Bracket Junction Bracket (3 circuit) (4 circuit) Bottom Beam Plate amqsolutions.com ILINE INSTALLATION GUIDE | 32...
PHASE 1 | Footer & Base Plate Assembly ILINE 90°/180° (4-WAY) Step 1 Insert a 3” bolt into each of the 2” compression springs. Step 2 Insert the bolts and the compression springs into the - 4” x 3” Bolt (5/16” x 18) inner corner holes of the base plate.
Page 34
PHASE 2 | Footer & Base Plate Assembly ILINE 90°/180° (4-WAY) amqsolutions.com ILINE INSTALLATION GUIDE | 34...
PHASE 2 | Beam Assembly (3-Circuit) ILINE 90°/180° (4-WAY) Step 1 Step 2 Place beam upside down on the floor to reveal the Insert the sliding clip into the beam from the top beam canal. and slide it to the sides. (Make sure the tab below the clip goes into the slot on the beam.) amqsolutions.com ILINE INSTALLATION GUIDE | 35...
Page 36
PHASE 2 | Beam Assembly (3-Circuit) ILINE 90°/180° (4-WAY) Step 3 Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the receptacles facing the beam cut-out. Beam Cut-Out Side Step 4 Step 5...
PHASE 2 | Beam Assembly (4-Circuit) ILINE 90°/180° (4-WAY) Step 1 Step 2 Place beam upside down on the floor to reveal the Insert the sliding clip into the beam from the top beam canal. and slide it to the sides. (Make sure the tab below the clip goes into the slot on the beam.) amqsolutions.com ILINE INSTALLATION GUIDE | 37...
Page 38
PHASE 2 | Beam Assembly (4-Circuit) ILINE 90°/180° (4-WAY) Step 3 Mount 2 receptacle on one side of the junction block. Insert the junction block slighfly tilted like in the diagram with the junction block without the receptacles facing the beam cut-out. Beam Cut-Out Side Step 4 Step 5...
PHASE 1 | Post, Beam Plate & Feet Assembly ILINE 90°/180° (4-WAY) NOTE: Inner-to-Inner beams are slightly longer than Outer-to-Inner beams. NOTE: L-shaped configurations must use Inner-to-Inner beam. Step 1 Step 3 Once complete, lay each beam assembly between Slide the beam assemblies onto each of the each foot assembly.
Page 40
PHASE 1 | Post, Beam Plate & Feet Assembly ILINE 90°/180° (4-WAY) Step 4 Take the exposed end of the power entry and feed through the desired end of the beam and into the adjacent post-opening. Continue to feed the power entry until the exposed end is out through one of the base plate’s openings.
PHASE 2 | Installing Jumpers ILINE 90°/180° (4-WAY) Step 1 Step 3 Connect power entry plug to the junction block. Connect the jumper to each junction block. Step 2 Step 4 Feed the jumper through the beam canal and Repeat Steps 1-3 until the last jumper is connected into the vertical post opening into the next beam the last junction block.
PHASE 3 | Installing Caps & Covers ILINE 90°/180° (4-WAY) Step 1 Step 2 Insert side covers into all exposed openings of Place top caps on all vertical posts. each vertical posts. Step 3 Step 4 Take two data adapters/face plates and snap Insert the bottom beam plates between each data them onto each end of the underside of the beam adapter on the underside of the beam assembly.
PHASE 4 | Installing Caps & Covers — Post Sleeve ILINE 90°/180° (4-WAY) Step 1 Detach the pre-cut portion for the base feed access and line up with post. Step 2 Align the Post Sleeve* on both sides and apply pressure until pieces snap into place. Step 3 Installed Post Sleeve.
PHASE 5 | Installing Screens ILINE 90°/180° (4-WAY) NOTE: Pre-measuring each clip’s distance from the beam ends before attaching will ensure a centered and balanced appearance to the installed screen. (Suggested distance between clip and beam edge: 11 inches.) NOTE: For 22”...
PHASE 6 | Final Adjustments ILINE 90°/180° (4-WAY) H o r i z o n t a l a l i g e n t * Adjust height of each coupling-nuts to level the base plate of each post. Step 1 Step 2 Check the vertical and horizontal alignment of the If not aligned, use a 1/2”...
PHASE 7 | Power Pole Retrofit ILINE 90°/180° (4-WAY) Step 1 Step 3 Mount the adapter bracket to power pole using two Anchor down the post with two screws into the machine screws and two self tappers. vertical post. Step 2 Step 4 Insert Power Pole with adapter bracket into the slot Adjust glide in the bottom plate to the floor level.
Page 47