Download Print this page
AMQ ACTIV-Pro3 Installation Manual
Hide thumbs Also See for ACTIV-Pro3:

Advertisement

Quick Links

ACTIV-Pro3 installation guide

Advertisement

loading

Summary of Contents for AMQ ACTIV-Pro3

  • Page 1 ACTIV-Pro3 installation guide...
  • Page 2 FR x 1 end x 2 Hardware handset x 1 wood handset screw screw x 12 (special) x 23 power box cable clips screw caps 8mm 5mm x 12 allen keys amqsolutions.com ACTIV-PRO3 HEIGHT ADJUSTABLE BASE INSTALLATION GUIDE | 2...
  • Page 3 Assemble center leg to center bracket with M6 screws. Front Right, Back Right, Front Left and Back Left are indicated on Center Bracket with the initials FR, BR, FL and BL amqsolutions.com ACTIV-PRO3 HEIGHT ADJUSTABLE BASE INSTALLATION GUIDE | 3...
  • Page 4 Match up frames to center bracket, lining up the holes to the degree that you are setting (90° or 120°). Screw in with M6 screws. Note limit of stretch length and assemble base within that limitation. maximum mounting distance amqsolutions.com ACTIV-PRO3 HEIGHT ADJUSTABLE BASE INSTALLATION GUIDE | 4...
  • Page 5 Assemble end legs to the stretcher bar ends using M6 (special) screws. Trim caps will be attached in Phase 4. NOTE: *For 48” width worksurfaces, do not install stretcher bars. amqsolutions.com ACTIV-PRO3 HEIGHT ADJUSTABLE BASE INSTALLATION GUIDE | 5...
  • Page 6 Add screws M6 (special). Tighten using Trim caps will be attached in Phase 4. NOTE: #4 allen key (or a long extension angle-tipped allen key to expedite the process). amqsolutions.com ACTIV-PRO3 HEIGHT ADJUSTABLE BASE INSTALLATION GUIDE | 6...
  • Page 7 Adjust stretcher bar to desired length. Place caps. Step 2 Tighten 4 factory inset screws to hold desired length in place. Make sure the screw bracket stays in the center of the stretcher bars amqsolutions.com ACTIV-PRO3 HEIGHT ADJUSTABLE BASE INSTALLATION GUIDE | 7...
  • Page 8 Attach cable management clips if using. Facing Direction Connect each plugs according to the drawing. Orientate yourself to the table assembly by facing as user to identify left and right motor. amqsolutions.com ACTIV-PRO3 HEIGHT ADJUSTABLE BASE INSTALLATION GUIDE | 8...
  • Page 9 Step 1. You may need to hold for 2-3 seconds to activate the base. If it does not adjust to the programmed NOTE: height, repeat Step 1 followed by Step 2. amqsolutions.com ACTIV-PRO3 HEIGHT ADJUSTABLE BASE INSTALLATION GUIDE | 9...
  • Page 10 Please contact cc@amqsolutions.com if you are missing any parts, have difficulty with assembly, or have any product related questions.