Installing Jumpers - AMQ ILINE Series Installation Manual

Table of Contents

Advertisement

PHASE 2 | Installing Jumpers
1
1
Step 1
Connect power entry plug to the junction block.
Step 2
Feed the jumper through the beam canal and
into the vertical post opening into the next beam
assembly.
ILINE INSTALLATION GUIDE | 41
The remaining installation of
STOP
electrical must be installed by
a professional electrician.
Step 3
Connect the jumper to each junction block.
Step 4
Repeat Steps 1-3 until the last jumper is connected
the last junction block.
ILINE 90°/180° (4-WAY)
3
2
2
amqsolutions.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iline 180 2-wayIline 120 3-wayIline 90/180 4-way

Table of Contents