Post, Beam Plate & Feet Assembly - AMQ ILINE Series Installation Manual

Table of Contents

Advertisement

PHASE 1 | Post, Beam Plate & Feet Assembly
NOTE:
Inner-to-Inner beams are slightly
longer than Outer-to-Inner beams.
Step 1
Once complete, lay each beam assembly between
each foot assembly.
NOTE:
Make sure the Outer-to-Inner beams are mounted
to the ends while the Inner-to-Inner beams go in
between them.
Step 2
Place (do not fasten) the vertical posts on each of
the footer assemblies.
ILINE INSTALLATION GUIDE | 39
1
2
4
4
NOTE:
L-shaped configurations must use
Inner-to-Inner beam.
Step 3
Slide the beam assemblies onto each of the
vertical posts and fasten each side of the beam
using 2 screws.
* Use phillip head screw to mount
beams on vertical posts.
ILINE 90°/180° (4-WAY)
4
4