Hardware Installation; Procedures Before Use; System Overview - Kemppi A3 Integration Manual

Table of Contents

Advertisement

3.

HARDWARE INSTALLATION

3.1 Procedures before use

The product is packed in specially designed transport
cartons. Unpack the products from the cartons, and check
that they have not been damaged during transportation.
Check that the contents are complete, and nothing is
missing.
The product's packaging material is recyclable.
When moving the welding machine, never pull it by the
welding-gun or other cables. For lifting the power source,
use the handles on top of the power source.
After installation, make sure all cables and hoses have
enough space to move and are attached properly.
Remember that the cable, plugs, and other electrical
devices may be installed or replaced only by a person
authorized to perform such operations.

3.2 System overview

Fieldbus
Figure 3.1: Connection diagram
© Kemppi Oy 2020
4
A3 MIG Welder
R01