1. Attach the threaded bolts (Fig. 3/1), on the stand (Fig. 3/3) of the unit, by screwing the threaded
bolts into the stand (Fig. 3/3).
2. Position the gasket (Fig. 4/1) on the stand (Fig. 4/2) of the unit.
3. Feed the tubes and cables through the opening into the supporting structure in a downward motion.
4. Place the unit onto the prepared supporting structure.
5. Position the sealing plate (Fig. 6/1) against the supporting structure.
6. Attach the unit to the supporting structure using threaded bolts (Fig. 7/3), wing nuts (Fig. 7/1)
or nuts and washers (Fig. 7/2), and tighten the wing nuts or nuts evenly.
Check that the unit is properly attached. After attachment, the unit must not tilt or overturn.
Installation and service manual Tower
Nueva
10
Installation/removal
1
2
1
Fig. 3
1
2
Fig. 4
Fig. 5
1
Fig. 6
1
2
3
Fig. 7
Cornelius Deutschland GmbH
Document no. TD0003100
Version 18/03/2019, Index 0