Repairs - Cornelius Nueva Tower Installation And Service Manual

Table of Contents

Advertisement

9. Fill the cleaning container with clear water.
10. Rinse all tubes with water, one after the other, by requesting a beverage from the respective dispensing valve; see dispensing
valve documentation.
-
Continue requesting a beverage for the syrup tubes until the water coming out of the dispensing valve runs clear.
-
Using TM Desanacid fp as a disinfectant for the water lines, continue requesting a beverage until the water coming out
of the dispensing valve runs clear.
-
Using hydrogen peroxide as a disinfectant for the water lines, continue requesting a beverage until you can no longer
detect any hydrogen peroxide levels using test strips.
You can only continue to the next step if and when all tubes have been rinsed with water.
In the next step, the tubes of the unit will either be filled, see Step 11, or the unit will be shut down, see 8.2.
Step 11
11. Depressurise the cleaning container and the tubes by using the pressure relief valve on the cleaning container.
12. Disconnect all basic ingredient/beverage tubes of the undercounter cooler from the cleaning container.
13. Connect all basic ingredient/beverage tubes to the undercounter cooler; see the document "Undercounter cooler installation
and service manual".
14. Fill the tubes by requesting a beverage from the respective dispensing valve until the beverage is being dispensed; see dis-
pensing valve documentation.
7

Repairs

DANGER!
Risk of personal injury and equipment damage due to non-compliance with safety information!
Failure to observe the safety information will result in a risk of bringing about operating conditions at the unit,
which may cause personal injury or equipment damage.
Please always strictly observe all safety measures and information/instructions; see chapter 1.
NOTICE!
All installation, maintenance and repair work at the unit is to be carried out by an expert only.
WARNING!
Risk of personal injury and equipment damage due to operation by non-qualified staff!
It is dangerous for non-qualified staff to operate the unit!
Service operations on this unit may only be carried out by trained and certified experts who have been
trained in carrying out service operations on this unit.
All wiring and plumbing must be carried out in compliance with national and local laws, regulations and
guidelines. Non-compliance with these laws, regulations and guidelines may result in death, serious injury
or equipment damage.
Installation and service manual Tower
Nueva
16
Repairs
Cornelius Deutschland GmbH
Document no. TD0003100
Version 18/03/2019, Index 0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

220096999

Table of Contents